
MACH 6 Quick Reference Guide
K990291 Rev. C
Daily Requirements Powder Canister Level and moisture
Monthly Requirements Filters and Moisture
Handpiece/s Handpiece Hose/s and Nozzles
Pinch Tube (check)
Quarterly Requirements Pinch Tube (replace)
BI-Annual Requirements Pinch Valve Assembly (lubricate)
Inspect Canister components
Annual Requirements Air In and Out In-Line Filters (replace)
Internal Tubing (re-tube)
Powder Canister (replace components)
Maintenance Checks
No. Maintenance item 6 mo. 12 mo. 18 mo. 24 mo.
PM 1 Maintain Pinch Valve XX XX XX XX
PM 2 Replace Filters & Tubing XX XX
PM 3 Maintain Powder Canister XX XX
PM 4 Calibrate system XX XX XX XX
PM 1. Maintain pinch valve block 6/12 Months): .50 hour
One Year Maintenance Kit K150034
PM 2. Replace the Filters and tubing (12 months): 1.0 hour
One Year Maintenance Kit K150034
PM 3. Check Powder Canister (6/12 months): 0.5 hour
One Year Maintenance Kit K150034
Check Canister Gasket and lid
Clear powder ports and back flush canister
Clean Gasket and Canister lid
Clear and measure Orifice Plate holes
Replace powder and verify system operation
Maintain Powder Canister (12 month) 1.0 hour
One Year Maintenance Kit K150034
PM 4. Calibrate system (6 months): 1.0 hour
Verify and calibrate using procedure
Kommentare zu diesen Handbüchern